Luca Solar Power Project – 99 MWp Solar Development in Iloilo
-
June 2027Commercial Operation Date
-
99.02 MWpSolar Array
-
119.5 haTotal Area
-
158,424Solar Panels
-
157,640,168 kWhEstimated yield p.a
The project
Apolaki Eight Inc. is developing the 99.02 MWp / 80 MWac Luca Solar Power Project in Barangay Luca, Municipality of Ajuy, and Barangay Santo Tomas, Municipality of Barotac Viejo, Iloilo. The project includes the construction of a transmission line with a total length of approximately 10.5 kilometres, traversing Barangays Luca, San Fernando, Santiago, Puerto Princesa, Santo Tomas, and San Juan, connecting to the National Grid Corporation of the Philippines (NGCP) substation in Barotac Viejo.
Project status

Documents

Get in touch with us
Asia Pacific Headquarters
ib vogt Singapore Pte. Ltd.
111A, 113A, 115A Telok Ayer Street
Singapore 068580, 068582, 068584
Singapore
E-Mail
MarketingAPAC@ibvogt.com
Follow us

At ib vogt, we believe in building solar projects with the support of the local community and better the environment for those around it.
If you have a feedback regarding an ib vogt project, please contact us.